Switchgear & Control Low Voltage (GCK/GCS/MNS) SKU: THREE_PHASE_LOW_VOLTAGE_AUTOMATIC_TRANSFER_SWITCH_ATS_PANEL

Three-Phase Low Voltage Automatic Transfer Switch (ATS) Panel

This three-phase low voltage automatic transfer switch (ats) panel is designed for electrical control, automation, and panel-based distribution functions in industrial and infrastructure projects. It combines structured cabinet construction with configurable components, protection devices, and optional communication or automation features according to project requirements.

Compliance Standards
IEC • ANSI • IEEE • GB
Quality Inspection
100% FAT Routine Tested
Engineering CAD
2D CAD / SLD Schematics
Global Logistics
Direct Seaport CIF Export
Engineering Datasheet

Three-Phase Low Voltage Automatic Transfer Switch (ATS) Panel — Technical Parameters & Ratings

Print Submittal Datasheet IEC / ANSI Certified Factory Standard
Rated Voltage 400 V / 415 V / 440 V
Frequency 50 Hz / 60 Hz
Phase Three Phase
Structure Type Electrical control cabinet
Insulation Type Air insulated
Standard IEC / GB / customized project specification
Installation Indoor / outdoor according to enclosure design
Application Distribution substations / industrial plants / building electrical systems

Technical Highlights

  • This product combines structured cabinet design, practical electrical coordination, and project-specific configuration flexibility. It is suitable for power systems that need reliable switching or control performance, organized maintenance access, and scalable options for monitoring, communication, and protection.

Application Scenarios

  • Motor control and industrial automation
  • Power factor correction systems
  • Building services and utility rooms
  • Process control systems
  • Project-based control cabinet integration

Key Features

  • Designed for electrical control, automation, and load-side switching functions
  • Configurable internal component arrangement according to process and feeder requirements
  • Supports communication, metering, and interface options for smart plant integration
  • Cabinet construction suitable for industrial and infrastructure environments
  • Project-oriented documentation, labeling, and wiring scheme support available
  • Suitable for export supply and customized control-package delivery

Optional Configurations

  • Rated current and outgoing feeder layout
  • Breaker brand, control logic, and metering options
  • Communication and monitoring functions
  • Cabinet protection level and enclosure finish
  • Busbar material and cable entry arrangement
  • Labeling, mimic diagram, and project-specific wiring documents
  • Color, nameplate language, and document package
  • Ambient temperature, altitude, and installation condition adaptation

Engineering Submittal & Layout Workbench

Substation Room Fit & Multi-Equipment CAD Footprints

Select your equipment type and capacity to inspect verified GA engineering CAD line drawings, Single Line Diagrams (SLD), dimensions (L × W × H), roller gauge, and submittal clearances before procurement.

Available Ratings:
IEC 60076-1 Submittal Specs
XinHuan Engineering GA CAD Drawing
XinHuan Engineering Single Line Diagram (SLD)
11kV / 33kV Dual Voltage
IEC 60076 / IEEE Compliant
100% Routine Factory Tested
Export Nitrogen / Seaworthy Pack

1000 kVA Technical Dimensions

IEC 60076-1

International utility & industrial submittal specifications

Overall Length (L) 1,750 mm
Overall Width (W) 1,120 mm
Overall Height (H) 1,780 mm
Roller Wheel Track Gauge (D) 820 mm
Total Equipment Net Weight 3,820 kg
Min Substation Clearance 1,000 mm surrounding
Rated Voltage / System 11 kV / 33 kV Dual Primary
Applicable Standard IEC 60076-1 / IEEE C57
Download Technical Data Sheet (PDF) Request Factory Engineering Submittal Package

Full CAD DXF/DWG vector footprints, 3D STEP models, and custom project submittals provided within 2 hours upon request.

Three-Phase Low Voltage Automatic Transfer Switch (ATS) Panel — XinHuan Prefabricated Substation & Switchgear Assembly Line
XinHuan Hefei Manufacturing Plant — Precision Winding & Assembly Line
Factory Build Quality

Three-Phase Low Voltage Automatic Transfer Switch (ATS) Panel — Internal Construction & Premium Materials

Built with tier-1 certified raw materials engineered for long operational life (>30 years), superior dielectric withstand, and high short-circuit withstand capacity.

Silicon Steel Core

High-grade grain-oriented cold-rolled silicon steel with step-lap mitered joints for low $P_o$ losses.

100% Copper Windings

Electrolytic oxygen-free copper with high thermal grade insulation for surge resistance.

Precision Tap Changer

De-energized tap switch ($\pm 2 \times 2.5\%$) or on-load vacuum tap changer (OLTC) optional.

Protection & Sensors

Buchholz gas relay, magnetic oil gauge (MOG), and dial thermometers with alarm contacts.

Quality Assurance

Three-Phase Low Voltage Automatic Transfer Switch (ATS) Panel — 100% Factory Acceptance Testing (FAT)

CNAS & ISO 9001 Certified

Every transformer unit manufactured by XinHuan undergoes mandatory routine factory testing prior to container dispatch. Full certified routine and type test submittal reports are provided with commercial documentation:

1. Insulation Resistance

Megger test (HV to LV, HV to Earth, LV to Earth) >1000 MΩ.

2. Voltage Ratio & Vector

Turns ratio check across all taps with phase displacement check.

3. Winding DC Resistance

Precision Kelvin bridge measurement across all tap positions.

4. Short-Circuit Impedance

Load loss ($P_k$) measurement corrected to reference temp (75°C).

5. No-Load Loss & Current

Core excitation test ($P_o$ and $I_o$) at rated sinusoidal voltage.

6. AC Voltage Withstand

Power-frequency separate source test (e.g. 50kV/70kV 1 min).

7. Lightning Impulse (BIL)

Full wave & chopped wave impulse withstand (BIL up to 170kV).

8. Partial Discharge & Seals

Ultra-low discharge (<5 pC) and pressurized oil/gas tightness test.

Logistics Intelligence

Three-Phase Low Voltage Automatic Transfer Switch (ATS) Panel — Export Packaging & Seaport Logistics

Global CIF / FOB Delivery

The product is prepared for export shipment with suitable packing and handling arrangements based on destination, lifting, and transport requirements. Technical documents, test reports, labeling confirmation, and pre-shipment coordination can be supplied according to order requirements. OEM/ODM support and project-based coordination are available for qualified inquiries.

Production Lead Time

Standard manufacturing cycle is 4 to 6 weeks from approval of GA blueprints and single-line diagrams.

Heavy-Duty Export Packaging

Vacuum moisture barrier preservation, nitrogen blanketing, and reinforced steel-frame structural crate skids.

Direct Seaport Routes

Fast ocean freight to Port of Chancay & Callao (25-35 days), Manila, Lagos, and Middle East ports.

Equipment Video Inspection

100% Tested

Watch XinHuan technicians perform routine dielectric testing, winding insulation checks, and quality inspections inside our Hefei manufacturing plant.

Every unit 100% routine tested before container loading.
Direct Factory Consultation

Need Custom Project Engineering?

Send your single-line diagram (SLD), voltage ratings, or tender specifications. Our chief electrical engineers will review and issue an actionable CIF quotation within 24 hours.

Custom Voltage Ratios
High-Altitude Derating
Short-Circuit Impedance
Third-Party FAT Witness

Three-Phase Low Voltage Automatic Transfer Switch (ATS) Panel — Engineering & Procurement FAQs

Frequently asked questions regarding specifications, certifications, and delivery for Three-Phase Low Voltage Automatic Transfer Switch (ATS) Panel.

Please send us your required rated voltage, current, feeder configuration, protection functions, communication requirements, and installation conditions for the three-phase low voltage automatic transfer switch (ats) panel. Our team can recommend a suitable configuration and provide a quotation based on your project requirements.

The equipment can be produced according to IEC standards and customer technical specifications. Routine inspection records, wiring documents, component lists, and factory test information can be provided before shipment. Optional configurations for communication, enclosure protection, and project-specific electrical interfaces are available upon request.

Standard manufacturing lead time is 4 to 6 weeks following approval of GA blueprints and single-line diagrams. Direct sea container shipping is available under FOB, CFR, or CIF terms with full customs documentation (Bill of Lading, Certificate of Origin, Test Reports).
PARENT ENGINEERING PILLAR IEC 60076 · 50–3150 kVA Loss & Impedance Tables

11kV Distribution Transformers Pillar Guide

Compare full capacity no-load loss ($P_0$), load loss ($P_k$), impedance ($U_k\%$), dimensional weights, and routine test tolerances across all models in this series.

Engineering Reference Silo

Transformer Category Pillars & International Standards

China Transformer Manufacturer Export Hub

Ready to Proceed?

Request a Firm Quotation for Three-Phase Low Voltage Automatic...

Share your project specifications and receive an official CIF quotation within 24 hours.