Ready to Proceed?
Request a Firm Quotation for 10kV High-Voltage Prepayment Power...
Share your project specifications and receive an official CIF quotation within 24 hours.
Integrated high-voltage prepayment power metering station (YFJLSZV-10W / JLS-10). Combines precision combined CT/PT metering units, an intelligent multi-function energy meter, and a motor-driven vacuum load switch / circuit breaker. Automatically trips supply upon credit exhaustion to eliminate utility revenue loss.
| System Voltage | 10 kV (3-Phase 3-Wire or 4-Wire) |
|---|---|
| Metering Accuracy | Class 0.2S (Active) / Class 0.5 (Reactive) |
| Prepayment Protocol | STS standard / IC Card / Remote 4G Cellular |
| Associated Switch | Vacuum Circuit Breaker (ZW32) or Load Switch |
| Enclosure Material | Stainless steel (SS304) or hot-dip galvanized steel |
| Protection Rating | IP54 Outdoor Weatherproof |
Engineering Submittal & Layout Workbench
Select your equipment type and capacity to inspect verified GA engineering CAD line drawings, Single Line Diagrams (SLD), dimensions (L × W × H), roller gauge, and submittal clearances before procurement.
International utility & industrial submittal specifications
| Overall Length (L) | 1,750 mm |
|---|---|
| Overall Width (W) | 1,120 mm |
| Overall Height (H) | 1,780 mm |
| Roller Wheel Track Gauge (D) | 820 mm |
| Total Equipment Net Weight | 3,820 kg |
| Min Substation Clearance | 1,000 mm surrounding |
| Rated Voltage / System | 11 kV / 33 kV Dual Primary |
| Applicable Standard | IEC 60076-1 / IEEE C57 |
Full CAD DXF/DWG vector footprints, 3D STEP models, and custom project submittals provided within 2 hours upon request.
Built with tier-1 certified raw materials engineered for long operational life (>30 years), superior dielectric withstand, and high short-circuit withstand capacity.
High-grade grain-oriented cold-rolled silicon steel with step-lap mitered joints for low $P_o$ losses.
Electrolytic oxygen-free copper with high thermal grade insulation for surge resistance.
De-energized tap switch ($\pm 2 \times 2.5\%$) or on-load vacuum tap changer (OLTC) optional.
Buchholz gas relay, magnetic oil gauge (MOG), and dial thermometers with alarm contacts.
Every transformer unit manufactured by XinHuan undergoes mandatory routine factory testing prior to container dispatch. Full certified routine and type test submittal reports are provided with commercial documentation:
Megger test (HV to LV, HV to Earth, LV to Earth) >1000 MΩ.
Turns ratio check across all taps with phase displacement check.
Precision Kelvin bridge measurement across all tap positions.
Load loss ($P_k$) measurement corrected to reference temp (75°C).
Core excitation test ($P_o$ and $I_o$) at rated sinusoidal voltage.
Power-frequency separate source test (e.g. 50kV/70kV 1 min).
Full wave & chopped wave impulse withstand (BIL up to 170kV).
Ultra-low discharge (<5 pC) and pressurized oil/gas tightness test.
Full enclosure crate with shock-damped transport base.
Standard manufacturing cycle is 4 to 6 weeks from approval of GA blueprints and single-line diagrams.
Vacuum moisture barrier preservation, nitrogen blanketing, and reinforced steel-frame structural crate skids.
Fast ocean freight to Port of Chancay & Callao (25-35 days), Manila, Lagos, and Middle East ports.
Watch XinHuan technicians perform routine dielectric testing, winding insulation checks, and quality inspections inside our Hefei manufacturing plant.
Send your single-line diagram (SLD), voltage ratings, or tender specifications. Our chief electrical engineers will review and issue an actionable CIF quotation within 24 hours.
Frequently asked questions regarding specifications, certifications, and delivery for 10kV High-Voltage Prepayment Power Metering Unit (YFJLSZV-10W / JLS-10).
Compare full capacity no-load loss ($P_0$), load loss ($P_k$), impedance ($U_k\%$), dimensional weights, and routine test tolerances across all models in this series.
Engineering Reference Silo
Ready to Proceed?
Share your project specifications and receive an official CIF quotation within 24 hours.