Instrument Transformers Combined Metering Units (MOF/JLS) SKU: 10KV_HV_PREPAYMENT_POWER_METERING_BOX_YFJLSZV_10W

10kV High-Voltage Prepayment Power Metering Unit (YFJLSZV-10W / JLS-10)

Integrated high-voltage prepayment power metering station (YFJLSZV-10W / JLS-10). Combines precision combined CT/PT metering units, an intelligent multi-function energy meter, and a motor-driven vacuum load switch / circuit breaker. Automatically trips supply upon credit exhaustion to eliminate utility revenue loss.

Compliance Standards
IEC • ANSI • IEEE • GB
Quality Inspection
100% FAT Routine Tested
Engineering CAD
2D CAD / SLD Schematics
Global Logistics
Direct Seaport CIF Export
Engineering Datasheet

10kV High-Voltage Prepayment Power Metering Unit (YFJLSZV-10W / JLS-10) — Technical Parameters & Ratings

Print Submittal Datasheet IEC / ANSI Certified Factory Standard
System Voltage 10 kV (3-Phase 3-Wire or 4-Wire)
Metering Accuracy Class 0.2S (Active) / Class 0.5 (Reactive)
Prepayment Protocol STS standard / IC Card / Remote 4G Cellular
Associated Switch Vacuum Circuit Breaker (ZW32) or Load Switch
Enclosure Material Stainless steel (SS304) or hot-dip galvanized steel
Protection Rating IP54 Outdoor Weatherproof

Engineering Submittal & Layout Workbench

Substation Room Fit & Multi-Equipment CAD Footprints

Select your equipment type and capacity to inspect verified GA engineering CAD line drawings, Single Line Diagrams (SLD), dimensions (L × W × H), roller gauge, and submittal clearances before procurement.

Available Ratings:
IEC 60076-1 Submittal Specs
XinHuan Engineering GA CAD Drawing
XinHuan Engineering Single Line Diagram (SLD)
11kV / 33kV Dual Voltage
IEC 60076 / IEEE Compliant
100% Routine Factory Tested
Export Nitrogen / Seaworthy Pack

1000 kVA Technical Dimensions

IEC 60076-1

International utility & industrial submittal specifications

Overall Length (L) 1,750 mm
Overall Width (W) 1,120 mm
Overall Height (H) 1,780 mm
Roller Wheel Track Gauge (D) 820 mm
Total Equipment Net Weight 3,820 kg
Min Substation Clearance 1,000 mm surrounding
Rated Voltage / System 11 kV / 33 kV Dual Primary
Applicable Standard IEC 60076-1 / IEEE C57
Download Technical Data Sheet (PDF) Request Factory Engineering Submittal Package

Full CAD DXF/DWG vector footprints, 3D STEP models, and custom project submittals provided within 2 hours upon request.

10kV High-Voltage Prepayment Power Metering Unit (YFJLSZV-10W / JLS-10) — XinHuan Oil-Immersed Transformer Core Stacking & Winding Workshop
XinHuan Hefei Manufacturing Plant — Precision Winding & Assembly Line
Factory Build Quality

10kV High-Voltage Prepayment Power Metering Unit (YFJLSZV-10W / JLS-10) — Internal Construction & Premium Materials

Built with tier-1 certified raw materials engineered for long operational life (>30 years), superior dielectric withstand, and high short-circuit withstand capacity.

Silicon Steel Core

High-grade grain-oriented cold-rolled silicon steel with step-lap mitered joints for low $P_o$ losses.

100% Copper Windings

Electrolytic oxygen-free copper with high thermal grade insulation for surge resistance.

Precision Tap Changer

De-energized tap switch ($\pm 2 \times 2.5\%$) or on-load vacuum tap changer (OLTC) optional.

Protection & Sensors

Buchholz gas relay, magnetic oil gauge (MOG), and dial thermometers with alarm contacts.

Quality Assurance

10kV High-Voltage Prepayment Power Metering Unit (YFJLSZV-10W / JLS-10) — 100% Factory Acceptance Testing (FAT)

CNAS & ISO 9001 Certified

Every transformer unit manufactured by XinHuan undergoes mandatory routine factory testing prior to container dispatch. Full certified routine and type test submittal reports are provided with commercial documentation:

1. Insulation Resistance

Megger test (HV to LV, HV to Earth, LV to Earth) >1000 MΩ.

2. Voltage Ratio & Vector

Turns ratio check across all taps with phase displacement check.

3. Winding DC Resistance

Precision Kelvin bridge measurement across all tap positions.

4. Short-Circuit Impedance

Load loss ($P_k$) measurement corrected to reference temp (75°C).

5. No-Load Loss & Current

Core excitation test ($P_o$ and $I_o$) at rated sinusoidal voltage.

6. AC Voltage Withstand

Power-frequency separate source test (e.g. 50kV/70kV 1 min).

7. Lightning Impulse (BIL)

Full wave & chopped wave impulse withstand (BIL up to 170kV).

8. Partial Discharge & Seals

Ultra-low discharge (<5 pC) and pressurized oil/gas tightness test.

Logistics Intelligence

10kV High-Voltage Prepayment Power Metering Unit (YFJLSZV-10W / JLS-10) — Export Packaging & Seaport Logistics

Global CIF / FOB Delivery

Full enclosure crate with shock-damped transport base.

Production Lead Time

Standard manufacturing cycle is 4 to 6 weeks from approval of GA blueprints and single-line diagrams.

Heavy-Duty Export Packaging

Vacuum moisture barrier preservation, nitrogen blanketing, and reinforced steel-frame structural crate skids.

Direct Seaport Routes

Fast ocean freight to Port of Chancay & Callao (25-35 days), Manila, Lagos, and Middle East ports.

Equipment Video Inspection

100% Tested

Watch XinHuan technicians perform routine dielectric testing, winding insulation checks, and quality inspections inside our Hefei manufacturing plant.

Every unit 100% routine tested before container loading.
Direct Factory Consultation

Need Custom Project Engineering?

Send your single-line diagram (SLD), voltage ratings, or tender specifications. Our chief electrical engineers will review and issue an actionable CIF quotation within 24 hours.

Custom Voltage Ratios
High-Altitude Derating
Short-Circuit Impedance
Third-Party FAT Witness

10kV High-Voltage Prepayment Power Metering Unit (YFJLSZV-10W / JLS-10) — Engineering & Procurement FAQs

Frequently asked questions regarding specifications, certifications, and delivery for 10kV High-Voltage Prepayment Power Metering Unit (YFJLSZV-10W / JLS-10).

Request our technical brochure covering STS token integration, GSM/GPRS AMR communication, and prepayment switchgear configurations.

Meets IEC 61869-4, IEC 62053, and STS prepayment token standards. Tamper-evident electronic seals.

Standard manufacturing lead time is 4 to 6 weeks following approval of GA blueprints and single-line diagrams. Direct sea container shipping is available under FOB, CFR, or CIF terms with full customs documentation (Bill of Lading, Certificate of Origin, Test Reports).
PARENT ENGINEERING PILLAR IEC 60076 · 50–3150 kVA Loss & Impedance Tables

11kV Distribution Transformers Pillar Guide

Compare full capacity no-load loss ($P_0$), load loss ($P_k$), impedance ($U_k\%$), dimensional weights, and routine test tolerances across all models in this series.

Engineering Reference Silo

Transformer Category Pillars & International Standards

China Transformer Manufacturer Export Hub

Ready to Proceed?

Request a Firm Quotation for 10kV High-Voltage Prepayment Power...

Share your project specifications and receive an official CIF quotation within 24 hours.